Resources

Stay up to date with the latest news & insights

Filter by category

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Blog

1 Bitcoin, 100 Builders: Highlights from MARA’s First Hackathon

3D relief map of Texas with elevation shading from brown to green and a white letter M above an orange line in the center.
Community

Responsible Growth Is the Right Standard for Texas Data Centers

AI, data center
Industrial site with rows of large server-like units or energy equipment outdoors at sunset, overlaid with a black rounded rectangle containing bold yellow text reading 'Q2 2026 EARNINGS' and smaller white text 'AND SHAREHOLDER UPDATE'.
Announcement

Q2 2026 MARA Earnings Call

earnings, press release
Graphic with a large black letter M above a yellow bar and text below stating '1,200+ acres of powered land,' with a faint image of an electricity transmission tower and the word 'TEXAS' in the upper right corner.
Announcement

MARA Signs Agreement with HIF to Acquire Strategic Powered Land Site in Texas

press release
Interior view of a data center room with rows of illuminated server racks on both sides and reflective ceiling and floor.
Blog

Two Paths Through the AI Power Crunch, & Why We Built for Both

AI, Long Ridge, data center
Aerial view of two industrial energy facilities side by side, one photographed in daylight surrounded by greenery and the other at dusk with lights illuminating pipes and buildings, overlaid with a black banner displaying the MARA and Long Ridge Energy & Power logos.
Blog

We Are Buying a 505-Megawatt Power Plant. Here's Why.

Long Ridge, AI
There are no available articles matching the current filters.

Stay Updated and subscribe

Get the latest news and announcements from MARA